Tennessee Lighting Company Brings Young Looks to Big Emory Baptist with Ovation E-910FC

As an experienced lighting designer/installer who has brought the benefits of LED systems to numerous churches, Ken Patterson is accustomed to getting letters from tech directors and pastors thanking him for introducing their house of worship to this new technology. However, even Ken wasn’t prepared for the response he received after installing the Ovation E-910FC ERS style LED fixture from CHAUVET Professional at Big Emory Baptist Church.

Ken commented about the venue: “The church sent me a letter signed by about 30 people glowing with their amazement at what the lights can do. Having gone from virtually no lighting system to something as modern and powerful, E-910FC was truly a quantum leap for them all.”

For Patterson, the letter was especially gratifying, because aside from enhancing services for church members, the new lighting system he installed also helped Big Emory Baptist take a major step toward achieving its goal of attracting more young worshippers.

As a key part of this youth movement, Big Emory Baptist’s leaders wanted to give their church a more contemporary look. Replacing their very out-of-date lighting system was essential to achieving this goal.

Ken stated the church had old Par56 300-watt lamps positioned way high up in architectural fixtures. There was virtually no useable light on the stage. The church team understood very well that they could not make the impact they wanted without doing something special with lighting. They wanted special lighting for Vacation Bible School, weddings, Christmas and Easter productions and more.

Budget and power draw were also high on the church’s list of concerns. The church expressed much desire to have the ability to add more lights later without extra electrical or rigging being added. Ken and his team always operate at 208VAC unless it’s just not feasible. Plus operating at 208VAC provides plenty of room to add on via powerCON.

Taking all of the church’s needs into consideration; the Ovation E-910FC became Patterson’s logical choice for the project. The RGBA-Lime fixtures provide a full range of vivid colors, along with a flat even field to give the church’s stage an exciting contemporary look. As LED fixtures, the Ovation units met the church’s needs for low power draw. Plus, given their high output, the church could achieve the looks it was after with fewer fixtures.

Only 12 of the E-910FCs could fit into the church’s budget for now, but given the output of these fixtures and compared with what was at the church before, the impact is quite dramatic. The new E-910FC is very affordable and has plenty of output, great colour mixing and lenses, and dims extremely smoothly so it was ideal for this application.

Ken hung all 12 of the Ovation E-910FC fixtures high and used them for front light. The church building has an exposed wooden beam ceiling and we hung the Ovations from those beams. Accessibility is important; more important than some functionality. If the staff at the church can’t reach the lights without an expensive lift rental and moving rows of pews, it won’t work for them.

As part of this project, Ken spent extra time training the church’s staff on how to get great looks from their new Ovation E-910FC fixtures.

Since they are very new to modern lighting consoles, Ken and his team spent extra time creating looks for them to replay and also extra time training them in system operation.

Based on the enthusiasm the church has shown for the new looks they can achieve with the Ovation fixtures, it’s likely that Big Emory Baptist will only get more involved in stage lighting in the future.

Ken concluded with: “They’ve seen what lighting can do. This is something that is only going to grow.”

https://www.chauvetprofessional.com